Exchanger Bundle Record
The bundle from pull to reinstall: cleaning, condition, tubes plugged against the limit, the test and the gaskets.
TURNAROUND QC
Turnaround QC
turnaroundqc.com
Project
Job No.
Client
Sheet ____ of ____
Exchanger Tag
Bundle / Serial No.
Pulled
Reinstalled
Tube Count
Tube Material
Tube OD / BWG
Cleaning Method
Hydroblast
Chemical clean
Mechanical / drill
Hydrolance
Not cleaned
Condition Found
Eddy Current / IRIS Report
Tubes Plugged (this TA)
Total Plugged
Plugging Limit (%)
Tubes Replaced
Retubed
Yes
No
Gaskets Renewed
Yes
No
Bundle Test Pressure
Bundle Test Result
Accept
Reject
Retest
Status
Pulled
In Shop
Cleaned
Tested
Repaired
Reinstalled
Replaced
Sign-Off
Shop / Contractor
QC Inspector
Owner
Print name
Signature
Date
TA-EXB-01 | Rev 0