Exchanger Closure Form

Which components were opened, whether each needed repair, and a signed release for every stage of closing it back up. Final acceptance is the package review.
TURNAROUND QC Turnaround QC
turnaroundqc.com
Project
Job No.
Client
Sheet ____ of ____
BundleChannel HeadFloating HeadBell HeadDollar PlateAnodeHot Torque
Inspection / Process / Repair Approval
ComponentRepair RequiredInsp. InitialsProcess InitialsRepair CompleteInsp. InitialsProcess InitialsComments
Shell
YesNo
YesNoN/A
Bundle
YesNo
YesNoN/A
Channel Head
YesNo
YesNoN/A
Dollar Plate
YesNo
YesNoN/A
Floating Head
YesNo
YesNoN/A
Bell Head
YesNo
YesNoN/A
Release to Install Bundle
Contractor QC
Inspection
Operations
Process Engineer
TAR / Maintenance Rep
Print nameSignatureDate
Release to Install Channel Head
Contractor QC
Inspection
Process Engineer
Print nameSignatureDate
Release to Install Floating Head / Bell Head (if applicable)
Contractor QC
Inspection
Process Engineer
Print nameSignatureDate
Release to Install Dollar Plate
Contractor QC
Inspection
Process Engineer
Print nameSignatureDate
TA-EXC-01  |  Rev 0 Free blank form from TURNAROUND QC — turnaroundqc.com