← All blank forms
Set margins to Default and turn OFF “Headers and footers” before printing.
Print / Save as PDF
Fit-Up Inspection
The joint before the root goes in: prep, gap, land, hi-lo and preheat, accepted by the inspector who looked.
TURNAROUND QC
Turnaround QC
turnaroundqc.com
Project
Job No.
Client
Sheet ____ of ____
Weld No.
Isometric
Date
Joint Preparation
Machined bevel
Torch cut and ground
Grinder
As supplied
Counterbore
Bevel Angle
Root Gap
Root Face / Land
Alignment / Hi-Lo
Tolerance
Preheat Applied (F)
Fitter
Prep and Adjacent Surfaces Clean
Yes
No
Tacks Inspected
Yes
No
Purge Required
Yes
No
Notes
Result
Accept
Reject
Re-fit
Inspected By
Sign-Off
Fitter
QC Inspector
Print name
Signature
Date
TA-FU-01 | Rev 0
Free blank form from
TURNAROUND QC
— turnaroundqc.com