← All blank forms Set margins to Default and turn OFF “Headers and footers” before printing.

Work Package Checklist

Everything a job package has to carry before the outage, with who owns each item.
TURNAROUND QC Turnaround QC
turnaroundqc.com
Project
Job No.
Client
Sheet ____ of ____
Item (complete, not applicable, or missing)StatusResourceRemarks
Work scope
YesNoN/A
Originator
Equipment data sheet / drawings
YesNoN/A
TA group
Torque sheet
YesNoN/A
TA group
Custody transfer form
YesNoN/A
TA group
Vessel / exchanger closure form
YesNoN/A
TA group
BOM's
YesNoN/A
TA materials
Bundle plan
YesNoN/A
TA group
Equipment history report
YesNoN/A
Inspection
Isolation work pack (P&IDs) / blind list
YesNoN/A
Operations
Lifting plan
YesNoN/A
TA log
Heavy equipment plan (crane / JLG / welders / etc.)
YesNoN/A
TA log
Inspection test plan (ITP)
YesNoN/A
Inspection
Cleaning requirements
YesNoN/A
Operations
Scaffold plan
YesNoN/A
TA group
Project work plan
YesNoN/A
TA group
Safety plans
YesNoN/A
Safety
Confined space plan (air mover / hoses / rescue kit)
YesNoN/A
Safety
Confined space entry rescue plan
YesNoN/A
Safety
Quality risk assessment (QRA)
YesNoN/A
Inspection
Operational procedures (flush / draining etc.)
YesNoN/A
Operations
Hazardous waste disposal plan
YesNoN/A
Env.
Resource loading plan
YesNoN/A
Planner
Schedule
YesNoN/A
Scheduler
Review and Approval
Safety
Operations
Engineering
Turnaround
Maintenance
Print nameSignatureDate
TA-WP-02  |  Rev 0 Free blank form from TURNAROUND QC — turnaroundqc.com