← All blank forms Set margins to Default and turn OFF “Headers and footers” before printing.

Work Package Review

The cover sheet on a job package: who reviewed it before the work was executed, and whether the package came back complete.
TURNAROUND QC Turnaround QC
turnaroundqc.com
Project
Job No.
Client
Sheet ____ of ____
Initial Package Review (planning) - required on every package
Process Engineer
Operations
Mechanical Engineer
QA/QC - Inspection
Print nameSignatureDate
Initial Package Review - as needed
Maintenance Representative
Project Manager
Construction Coordinator
TAR Representative
Rotating Engineer
DCS Engineer
I&E Representative
Env. Engineer
Print nameSignatureDate
Not StartedIn ReviewComplete
Documents associated with this package
Package Status (initial review)
YesNo
YesNo
YesNo
Final Package Status (counts on the dashboard)
YesNo
YesNo
YesNo
Transfer of Custody and Care
Contractor Document Control
Owner Document Control
Print nameSignatureDate
TA-WP-01  |  Rev 0 Free blank form from TURNAROUND QC — turnaroundqc.com